Rail-Way Bridges Solution

LPIC0005


LPIC0025

Another of our projects concerned the railway bridges operated by the Naples Compartment by the RFI Armament. Firstly we installed a Smart Point® on each bridge with the result that the bridge location, length, axial weight allowed, etc. are unambiguously identifiable, meanwhile the card showing the verification report has been computerizing.

Then we will effectively have then we will effectively have:

  • A computer update of the work done almost in real time thanks to the transfer of data from the handhelds to a host PC that hosts work schedule planning;
  • The certainty that the Operator has actually come to the place.